Key points

  • In the modeled deployment, capital recovery made up 87.3% of the fully loaded cost per token, and electricity made up 3.7%.
  • Useful output meeting service targets reached only 59.6% of the hardware's nameplate throughput.
  • Scheduling idleness and stranded burst reserve caused 25.2 of the 40.4 percentage points lost.
  • Pooling eight loosely correlated tenants recovered 7.3 pp of goodput, worth about $0.75M per year per megawatt of IT capacity.

Running trained AI models for users is usually treated as a question of electricity bills. A new cost analysis argues that hardware is the far bigger expense. In one modeled reference deployment, paying off the equipment accounted for 87.3% of the fully loaded cost of each token, or unit of text, that the system produced. Electricity accounted for just 3.7%. The work was submitted to arXiv by Sam Kingsley and is a preprint, so it has not yet been peer-reviewed.

Hardware costs pile up over time whether or not the chips are busy. Because of that, the paper argues, an accelerator's value is wasted when it sits idle, not when it draws power. In the model, useful output that met service-level targets, called SLO qualified goodput, reached only 59.6% of the hardware's rated, or nameplate, throughput. Of the 40.4 percentage points lost, 25.2 came from scheduling gaps and from spare capacity held back for traffic spikes.

The paper argues that both losses come from a customer's pattern of demand, not from its chips, and that no single customer can spread that risk on its own. In the model, pooling demand from eight tenants whose usage was only loosely linked (rho = 0.3) recovered 7.3 percentage points of goodput. That is about $0.75M per year per megawatt of IT capacity, or 2.8x to 4.9x the deployment's entire annual interconnection spending.

The paper says this has implications for neutral colocation and interconnection providers: the switching and interconnection layer that pools tenant demand works as a tool for capital productivity, even though it is priced as transport.

Why it matters

The analysis suggests that AI inference economics depend more on keeping costly accelerators busy than on energy prices. It also suggests that the network layer that pools customer demand may be worth more than its transport pricing implies.

What we don't know yet

The results come from a single modeled reference deployment in a preprint that has not been peer-reviewed. The pooling benefit assumes eight tenants with a correlation of 0.3.

Terms in this story

Inference
The stage at which a trained AI model is run to answer requests, as opposed to being trained.
Goodput
The part of a system's output that is actually useful, here meaning output that meets agreed service targets.
Colocation
A data-center arrangement in which many customers rent space, power and network connections in a shared facility.

Sources and verification

  1. Stranded Compute in AI Inference Workloads: Recovering Value Through Demand Aggregation arXiv · Nov 25, 2026 · preprint, not peer-reviewed
Fact-checked against the source on November 26, 2026: 22 factual claims verified.
Written in our own words: longest phrase shared with the source is 7 words.
Related image from Wikimedia Commons (CC BY 4.0), checked for relevance and that it is not AI-generated. It is not an image from the study.

DexScience articles are produced with AI assistance and an automated fact-check against the linked sources. Spotted an error? Tell us and we will correct it openly.